Review for proposals to divide land to create up to nine new lots. (LN)
Apply for this permit online at MyBuildingPermit. When entering your Application Information, choose the following:
- Application type: Land Use
- Project type: Nonresidential or Multifamily Residential or Single Family Residential
- Activity type: Land Division
- Scope of work: Short Plat - Preliminary
Required Documents
The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.
Building Design Documents and Site and Infrastructure Design Documents must be submitted as a single PDF. Each plan listed under the requirement must include a bookmark.
For assistance with electronic plan submittals, refer to Requirements for Electronic Plans
- Addressing Site Plan
- Bill To Form
- Site and Infrastructure Design Documents (Single PDF Including all Plans listed Below)
- Comprehensive Plan Policies
- Geotechnical Report
- Plat Map
- Preapplication Conference Letter
- Preliminary Storm Drainage Report
- SEPA Environmental Checklist
- Title Report (Report dated 90 days or less prior to application)
- A Title Report is a document prepared by a title company that provides a comprehensive overview of a property’s ownership history, legal encumbrances, and any liens or judgments attached to the property. This document is necessary for verifying ownership and confirming the legal establishment of lot lines, easements, and restrictions that may affect the property.
- Traffic Impact Analysis
- Wetland Report
- The wetland report is a report prepared by a qualified wetland biologist using best available scientific methods and the latest version of the Department of Ecology’s Washington State Wetland Rating System for Western Washington and the latest versions of the US Army Corps of Engineers Wetlands Delineation Manual and regional supplement. Wetland rating forms must be included with the wetland report. The report must determine the category of any wetlands as well as the required buffer and structure setback per LUC 20.25H and state/federal technical guidance. The report shall also include a wetland delineation which may be amended depending on the wetland report required. The delineation must be consistent with requirements and procedures for locating wetlands in the field and delineating them with field data, photographs, maps, flags that support the delineation. The report may also identify any other information or documents referenced used in the determination of wetland presence.