Installation of a new or modification of an existing wireless communication facility (includes associated equipment) on private or public property or a temporary facility. May include clearing & grading review. Requires building plan review. May require a separate Land Use Exemption, Administrative Conditional Use or Conditional Use and/or Electrical Permit. May or may not include SEPA. (CD)
Apply for this permit online through MyBuildingPermit.
Required Documents
The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.
- Bill To Form
- CSWPPP Long Form
- Construction Plans including the following:
- Existing and proposed equipment plans for all locations
- Location and dimensions of existing facility components
- Existing and proposed site grade. If no change, include a note reflecting no change.
- Area of ground disturbance for construction activities
- Details
- Visual Screening Methods and Materials: This may include vegetation screening. Include location, number, type and caliper (if applicable) of proposed trees, size of shrubs, or cut sheet for material type and color for any proposed screening.
- 6409a Compliance Letter
- A compliance letter provided by the City of Bellevue Development Services Department attesting compliance with the 6409a criteria.
- Letter of Compliance with FCC RF Standards
- A report and letter prepared and signed by a licensed RF Engineer attesting compliance with FCC RF Standards.
- Owner Authorization
- Service Coverage Area Map
- Basic Site Plan
- Structural Notes
- Visual Screening Method and Materials
Additional Documents
- SEPA Checklist
- Birdseye View and Photo Simulation
- WCF Dimensions